Looking for a specific product?

Make a search for products & suppliers, articles & news.

Windcat Workboats builds their 19th and 20th vessel with Servogear CPP

The delivery of the Servogear Ecoflow Propulsor to Windcat 43 and Windcat 44 will take place in Q2 and Q4 2018.

  

Servogear AS

Servogear are very proud to announce two new contracts with Windcat Workboats BV for the delivery of Servogear Ecoflow PropulsorTM for their two new vessels Windcat 43 and Windcat 44. This will be the 19th and 20th vessel equipped in cooperation between Servogear and Windcat Workboats since 2009. Both vessels are repeat of Windcat 42.

 

Windcat Workboats BV is Europe’s leading provider of specialist crew transfer vessels to the offshore wind power industry. Their fleets layout and propulsion are optimized to transfer personnel offshore in a safe and comfortable environment.

 

The delivery of the Servogear Ecoflow Propulsor to Windcat 43 and Windcat 44 will take place in Q2 and Q4 2018.

  

Windcat 43 and 44 main propulsion data:

 

  • Vessel type: Windfarm Service Vessel
  • Shipyard: Dok en Scheepsbouw
  • Length: 24 m
  • Main Engine: MTU 8V 2000 M72
  • Engine power/RPM: 2 x 720 kW@2250RPM
  • Gearbox: 2 x Servogear HD220U
  • Reduction ratio: 2,952: 1
  • Propeller diameter: 1075 mm

 

We thank Windcat Workboats BV for the order and look forward to another good and productive cooperation between our companies. 

 

Associated companies:


Related news

Latest news

TechnipFMC named top Petroleum International Contractor by ENR

This accomplishment places us in front of companies such as Petrofac,

The world’s energy demand will peak in 2035 prompting a reshaping of energy investment

The electrification trend is already enveloping the automotive industry.

DNV GL launches revised design standard and new certification guideline for floating wind turbines

The role of offshore wind, including floating offshore wind energy, 

Green Corridor JIP delivers innovative bulk carrier designs for a low emissions future

When the IMO confirmed the 2020 deadline for the 0.5 per cent global sulphur cap in 2016, 

DNV GL launches Operations & Analytics Centre in India to enable 24/7 monitoring for renewable assets globally

The new global monitoring centre is especially significant to independent power providers, 

DNV GL awards AiP to Jiangnan Shipyard for 93K cbm very large ethane carrier design “PANDA E”

The flexible, efficient and environmentally friendly design was developed by Jiangnan Shipyard in cooperation with GTT,

DNV GL starts phase II of project to examine the impact of phase-contamination on oil flow meters

Accurate measurement of the production of oil fields is an important means ...

Important message at the “AKVAculture Day”

We won’t be able to create growth unless we can handle the industry’s challenges.

Visit from the Ministry of Trade Industry and Fisheries

The Ministry visited in order to learn more about the industry.